Before Work Begins |
 |
Start date is determined |
 |
Contract is signed |
 |
Colors are selected and ordered |
|
|
|
First Day of
work: (Inspect and Pressure Wash) |
 |
Exterior items are covered and protected |
 |
Surfaces to be painted are pressure washed |
 |
Covered and protected items are uncovered and placed back to
their original locations |
 |
Surfaces are allowed to dry for at least 12 hours prior to
painting |
|
|
|
Second Day of
work: (Inspect, Prime, and possibly Paint) |
 |
Exterior items are covered and protected |
 |
Surfaces to be painted are scraped, sanded, caulked, puttied,
and primed as specified above |
 |
Time permitting; the painting process will begin on this day. If
painting does not begin on this day, it will it will begin on
the following workday. begin on the following workday. |
 |
Covered and protected items are uncovered and placed back to
their original locations |
|
|
|
Each Work Day
Following: |
 |
Exterior items are covered and protected |
 |
Paint surfaces as specified |
 |
Covered and protected items are uncovered and placed back to
their original locations |
|
|
|
After Work is
Complete: (Inspection) |
 |
Lead Painter and Project Manager Inspect work |
 |
Project Manager Inspects work |